Applying cedar shingles requires strict adherence to ventilation, fastener selection, and overlap specifications to ensure a service life exceeding 30 years. Success depends on maintaining precise weather exposure measurements and allowing for natural wood expansion to prevent cupping, splitting, or premature rot.
Essential Preparation and Technical Requirements
Proper installation of cedar shingles begins long before the first fastener is driven. Cedar is a natural, organic material that reacts to moisture and UV exposure; therefore, the substructure must be designed to facilitate rapid drying. For roofing applications, shingles must be installed over skip sheathing or a breather mat to prevent moisture entrapment on the underside of the wood.
- Essential Tools: Pneumatic shingle nailer (with depth control), stainless steel ring-shank nails (316 grade for coastal regions, 304 for inland), roofing hatchet or hammer, chalk line, tape measure, utility knife with hook blades, and scaffolding or fall protection gear.
- Safety Standards: OSHA-compliant fall protection is mandatory for all steep-slope applications. Ensure all staging is rated for the combined weight of personnel and material bundles.
- Material Thresholds: Only use edge-grain (vertical grain) shingles for maximum stability. Flat-grain shingles are prone to excessive warping and checking.
- Budget and Duration: Expect a material cost variance of 15-25% based on grade (Perfection, Royal, or Undercoursing). Installation time for a standard 1,500-square-foot roof typically spans 3 to 5 days for a professional two-person crew.
Technical Installation Workflow for Cedar Shingles
Step 1: Substructure and Underlayment Prep
Before laying shingles, verify the roof deck is dry and structurally sound. Install a high-quality, synthetic underlayment that is specifically rated for cedar roofs. Unlike asphalt shingles, cedar requires the ability to breathe. If installing over solid plywood decking, a dimpled drainage mat must be placed between the underlayment and the shingles.
Warning: Never use standard asphalt felt paper as the sole underlayment for cedar shingles, as it traps moisture against the bottom of the wood, leading to rapid decay.
Step 2: The Starter Course and Layout
The starter course must consist of a double layer of shingles. Align the first layer so that it overhangs the drip edge by approximately 1 to 1.5 inches. The second layer should be offset so the joints of the top layer do not align with the joints of the bottom layer. Use a chalk line to snap perfectly level horizontal lines across the entire roof plane to ensure consistent weather exposure.
Step 3: Maintaining Proper Weather Exposure
Weather exposure is the length of the shingle visible to the weather. For standard 16-inch shingles, a 5-inch exposure is the industry standard for roofs. Increase this to 7.5 inches for sidewall applications. Use a shingle gauge or your pre-marked chalk lines to ensure each course is uniform.
Step 4: Fastening and Joint Spacing
Each shingle must be fastened with two nails placed approximately 1 inch from the edge and 1.5 to 2 inches above the butt line of the succeeding course. Do not over-drive the nail head; it should sit flush with the shingle surface to avoid cracking the wood. Leave a 1/4-inch to 3/8-inch gap between each shingle to allow for lateral expansion during wet seasons.
Pro-Tip: Stagger your joints by at least 1.5 inches between courses. Never allow a vertical joint to line up with a joint in the course immediately below it, as this creates a direct path for water infiltration.
Step 5: Hip, Ridge, and Valley Treatment
Valleys are the most common points of failure. Use metal valley flashing (W-style) extending at least 10 inches up each slope. For hips and ridges, use pre-manufactured cedar ridge units or hand-cut shingles, ensuring they overlap in a way that sheds water away from the prevailing wind direction. Double-nail each unit to prevent wind uplift.
Progress Report: A Peek At Our Cedar Shingle Siding (So Far) & How We ...
Technical Specifications and Material Comparisons
| Feature | Roof Application | Sidewall Application | Fastener Type |
|---|---|---|---|
| Max Exposure | 5 inches (16" shingle) | 7.5 inches (16" shingle) | 316 Stainless Ring Shank |
| Expansion Gap | 1/4" to 3/8" | 1/8" to 1/4" | 2 Nails per Shingle |
| Underlayment | Breathable/Dimpled Mat | Building Paper/Housewrap | Corrosion Resistant |
| Overhang | 1.5 inches | 0.5 to 1 inch | Stainless Steel |
Common Site Failures and Field Fixes
- Root Cause: Over-driving fasteners. When nails are driven too deep, they crush the wood fibers and create depressions that pool water, leading to localized rot.
- Actionable Fix: Adjust the air compressor pressure and the nailer's depth-of-drive setting. Use a thin piece of stainless flashing to shim under the shingle to seal any existing punctures.
- Root Cause: Insufficient lateral spacing. When shingles are butted tight against one another, they have no room to expand when wet, causing the shingles to buckle or "tent."
- Actionable Fix: If buckling has occurred, use a fine-tooth pull saw to create the necessary 1/4-inch gap between affected shingles.
- Root Cause: Use of galvanized steel fasteners. Cedar contains natural tannins and acids that react with standard galvanized steel, causing black streaks and premature fastener corrosion.
- Actionable Fix: Replace all exposed galvanized fasteners with high-grade stainless steel immediately. If staining is aesthetic, use a dedicated oxalic acid wood brightener to lift tannin streaks.
Frequently Asked Questions
What is the ideal weather exposure for cedar shingles?
The ideal exposure is determined by the length of the shingle and the roof pitch. For a 16-inch shingle on a standard roof, 5 inches is the standard; for a 24-inch shingle, you may increase this to 7.5 inches. Always consult the specific product data sheet from your manufacturer as requirements vary by grade and region.
Can I install cedar shingles over existing asphalt shingles?
It is not recommended to install cedar directly over asphalt shingles. The asphalt creates a barrier that prevents the cedar from drying properly. If you must do this, you must install vertical strapping (furring strips) over the old roof to create a vented air space between the layers.
How do I prevent cedar shingles from turning gray?
Cedar naturally turns a silvery-gray due to UV exposure and the breakdown of lignin in the wood. If you wish to maintain the natural color, you must apply a high-quality, oil-based UV-blocking sealer every 2 to 3 years. Otherwise, the graying is a cosmetic change that does not impact the structural integrity of the wood.
Why are my cedar shingles cupping?
Cupping is usually caused by insufficient ventilation on the underside of the deck or using flat-grain shingles instead of edge-grain. Ensure the attic or wall cavity is properly vented to allow moisture to escape, as trapped humidity is the primary catalyst for cedar deformation.
Master the art of cedar installation by adhering to these technical standards, ensuring your project stands the test of time and weather. Contact a certified roofing specialist if your project involves complex geometric transitions or historical restoration requirements.